
Siakago Secondary School Classroom Block
Construction of a 6-classroom block at the diocesan-sponsored Siakago Secondary School to accommodate growing enrolment and reduce double-shifting.
Read More →Diocese of Mbeere

Construction of a 6-classroom block at the diocesan-sponsored Siakago Secondary School to accommodate growing enrolment and reduce double-shifting.
Read More →
Supply and installation of diagnostic equipment, maternity beds, and a backup solar power system at the Kiritiri Health Centre, Mayori Archdeaconry.
Read More →
Drilling of a 60-metre borehole and installation of a 10,000-litre elevated storage tank serving 3 villages and the local parish in Ngenge Archdeaconry.
Read More →
New permanent stone church building for St. John's Parish, Karaba — replacing a deteriorating timber structure that has served the congregation since the 1970s.
Read More →
Extension of the Macumo Development Integrated Centre to add carpentry and welding workshops, increasing training capacity from 40 to 120 trainees per cycle.
Read More →
Establishment of well-stocked reading libraries in 5 ACK-sponsored primary schools in Mbeere North, paired with a reading promotion programme for pupils.
Read More →
Installation of 10,000-litre ferrocement rainwater harvesting tanks at 8 parish centres and schools across Mayori Archdeaconry.
Read More →
Major renovation of St. Peter's Cathedral roof, electrical system, and internal fittings ahead of the Diocese's 25th anniversary celebrations in 2022.
Read More →